How much cement is required per square meter for plastering

Hello, Guys today in this article we are going to discuss How much cement required per square meter for plastering and how many cement bags required per square meter for plastering. Because Plastering is very important for a building. Plastering makes smooths the wall. We can not do the putty and paint work without plaster. So plastering work is important, and for the plastering cement and sand uses as the main ingredient. In such a situation for estimating the cost of plastering, You have to know how much cement and sand required per square meter for plastering.

How much cement and sand quantity require for 1 square meter of plastering? It depends on two factors.

  1. Mix ratio of Mortar
  2. Thickness of plaster
How much cement sand is required per square meter for plastering
How much cement, sand required per square meter for plastering

Types of Plastering mixing ratio

There are many types of mix ratios used for plastering. The plastering mix ratio depends on the type of surface on which plastering is to be done. Usually, four types of plastering mixing ratios are used, Which is like this 1:3, 1:4, 1:5, and 1:6. Different types of plastering mixing ratios use for different types of surfaces or work.

  • 1:3 Mix ratio: 1:3 cement and sand mix ratio is usually used for external wall repairing plastering. This mix ratio can sustain in server climate conditions and its mix ratio has more cement quantity. Therefore it uses for external wall repair.
  • 1:4 Mix Ratio: This mix ratio of cement and sand is used for ceiling plastering and external brick wall plastering.
  • 1:5 Mix Ratio: This mix ratio of cement and sand is used when the sand quality is not fine.
  • 1:6 Mix Ratio: This mix ratio of cement and sand is used, when sand quality is fine. This is the last mix ratio of cement and sand, that can use in plastering.

What should be the thickness of the plaster

The thickness of the plaster decides by the surface of the area, on which the plaster is to be done. Generally, 4 types of thickness are used in plastering, that is 6mm, 12mm, 15mm, and 20mm. Different types of thicknesses use for different types of surfaces for plastering.

  • 6mm thickness of plaster used for the plastering of the concrete structure and ceiling.
  • 12mm thick plaster is used for the plane of the surface of the brick wall like an internal wall.
  • Generally, 15mm and 20mm thick plaster is used for the rough surface of the brick wall like the external wall of buildings.

How many cement bags required per square meter for plastering

For this calculation will take plaster thickness = 12mm.
12mm is equal to 0.012m

We have taken the cement-sand ratio is 1:4 because this ratio widely uses.

We have given an area = 1m2.

Now, first, we will calculate the plaster volume of the brick wall.

The volume of brick wall plaster = Area × thickness
= 1 × 0.012 = 0.012 m3.

This is the wet volume of the cement sand mortar. As we know that to get the dry dry volume of mortar we have to multiply in wet volume by 1.33.

Therefore, Dry volume of mortar = wet volume of plaster mortar × 1.33
= 0.012 × 1.33 = 0.1596 m3.


Plastering estimate per square meter

The plastering estimate per square meter depends upon the mixing ratio of mortar, the thickness of plaster, and the surface area on which plaster is to be done. Because all these factors can affect the cement sand quantity. Here are two examples of how can it affect and how to calculate how much cement, and sand required for plastering per square meter.

Cement quantity for 1 square meter of plastering

cement sand mix ratio = 1:4,

So the total ratio = 1+4 = 5, In this ratio 1 part is cement and 4 part is sand.

Now we will calculate the cement volume in the mix

Calculate Cement volume = part of cement in the mix × volume of mortar
= 1/5 × 0.01596 = 0.003192.

To get the cement weight we have to multiply in cement volume by the density of the cement.

Density of the cement = 1440 kg/m3

Since cement weight = volume of cement × density of the cement
= 0.003192 × 1440 kg/m3
= 4.59 = 4.6 kg.

4.6 kg of cement requires for 1 square meter of plastering.

Sand quantity for 1 square meter of plastering

cement sand mix ratio = 1:4,

So the total ratio = 1+4 = 5, In this ratio 1 part is cement and 4 part is sand.

Now we will calculate the sand volume in the mix

Sand volume = part of sand in the mix × volume of mortar
= 4/5 × 0.01596 = 0.0127.

To get the sand weight we have to multiply in sand volume by the density of the sand.

Density of the sand = 1620 kg/m3

Since sand weight = volume of sand × density of the sand
= 0.0127 × 1620 kg/m3
= 20.68 = 21 kg.

21 kg sand requires for 1 square meter of plastering.

Cement and sand quantity per square meter for 20mm thick plaster

Plaster thickness = 20mm.
20mm is equal to 0.020m

The cement-sand ratio is 1:4 because this ratio widely uses.

We have given an area = 1m2.

Now, first, we will calculate the plaster volume of the brick wall.

The volume of brick wall plaster = Area × thickness
= 1 × 0.020 = 0.020 m3.

This is the wet volume of the cement sand mortar. As we know that to get the dry dry volume of mortar we have to multiply in wet volume by 1.33.

Therefore, Dry volume of mortar = wet volume of plaster mortar × 1.33
= 0.020 × 1.33 = 0.0266 m3.

Cement quantity for 1 square meter 20mm thick plaster

cement sand mix ratio = 1:4,

So the total ratio = 1+4 = 5, In this ratio 1 part is cement and 4 part is sand.

Now we will calculate the cement volume in the mix

Calculate Cement volume = part of cement in the mix × volume of mortar
= 1/5 × 0.0266 = 0.00532.

To get the cement weight we have to multiply in cement volume by the density of the cement.

Density of the cement = 1440 kg/m3

Since cement weight = volume of cement × density of the cement
= 0.00532 × 1440 kg/m3
= 7.66 = 7.7 kg.

7.7 kg of cement requires for 1 square meter of 20mm thick plaster.

Sand quantity for 1 square meter 20mm thick plaster

cement sand mix ratio = 1:4,

So the total ratio = 1+4 = 5, In this ratio 1 part is cement and 4 part is sand.

Now we will calculate the sand volume in the mix

Sand volume = part of sand in the mix × volume of mortar
= 4/5 × 0.0266 = 0.02128.

To get the sand weight we have to multiply in sand volume by the density of the sand.

Density of the sand = 1620 kg/m3

Since sand weight = volume of sand × density of the sand
= 0.02128 × 1620 kg/m3
= 34.47 = 24 kg.

24 kg sand requires for 1 square meter of 20mm thick plaster.

You Should Also Read This:

Conclusion:

Guys, In this article we have discussed how to calculate cement quantity in plaster and sand quantity in plaster. After reading this article you will also learn how to calculate cement volume in plastering and how to calculate sand volume in plastering.

FAQ
How much cement required for 1 square meter of plaster

For 1 square meter of plaster, cement will require 4.6 kg to 7.7 kg.

How much sand required for 1 square meter of plaster

For 1 square meter of plaster, sand will require 21 kg to 34 kg.

What should be the thickness of the plaster for the external brick wall

The thickness of the plaster should be 15mm to 20mm for the external brick wall. The recommended cement-sand ratio for the external brick wall is 1:4, In which 1 part is cement and 4 part is sand.

What is the thickness of the plaster for the ceiling

The thickness of the plaster should be 6mm for the ceiling. The recommended cement-sand ratio for the ceiling is 1:3, In which 1 part is cement and 3 part is sand.

Which mix ratio of the mortar used for plater crack repair

For repairing plaster cracks 1:3 mix ratio most commonly uses.

Leave a Comment