How much Cement, Sand, and aggregate required for 1m3 M15 grade concrete

Hello, guys in this article we are going to discuss how much cement, sand, and aggregate are required for M15-grade concrete. We will also discuss how much cement, sand, and aggregate are required for 1 cubic meter of M15-grade concrete.

Concrete is available in different grades like M7.5, M10, M15, M20, M25, and Design mix. Where M represents the Mix ratio and the numerical number represents the compressive strength of concrete. If you want to know how much cement, sand, and aggregate required for 1 cubic meter of M10 concrete then you can read our previous article.

What is Concrete

Concrete is a mixture of Cement, Sand, and Aggregate, and Generally concrete is of two types according to its physical condition. One is dry concrete and the second is wet concrete. Dry concrete is only a mixture of Cement, sand, and aggregate. But wet concrete is a mixture of Cement, Sand, Aggregate, and water. Usually, In western Europe and America, Ready mix concrete is sold.

Cement, sand, and aggregate for M15 concrete
Cement, sand, and aggregate for M15 concrete

Cement required for 1 cubic meter of M15 grade concrete

As we know for M15 grade concrete 1:2:4 ratio is used. Where 1 part is cement, 2 parts are sand, and 4 parts are Aggregate.

Cement part in the mix = 1/(sum of total proportion).
= 1/(1+2+4) = 1/7

To get the dry volume of concrete we have to multiply in volume by 1.54. Because the dry volume of concrete is always more than the wet volume of concrete.

Dry volume of concrete = Total volume × 1.54.
= 1m3 × 1.54 = 1.54m3.

The volume of cement = Cement part in M10 grade concrete mix × 1.54m3.
= 1/7 × 1.54m3.
= 0.142 × 1.54m3 = 0.218m3.

Now before calculating cement quantity in 1 cubic meter of M15 grade concrete. We have to calculate the volume of 1 bag of cement and 1 bag of cement contains 50 kg of cement.

We know the density of cement is 1440 kg/m2.

So, the volume of 1 bag of cement = 1 bag of cement weight ÷ density of cement.
= 50 ÷ 1440 = 0.0347m3.

The volume of 1 bag of cement is 0.0347m3.

Now, the quantity of cement for 1 cubic meter of M15 grade Concrete = total volume of cement ÷ volume of 1 bag of cement.
= 0.218m3 ÷ 0.0347m3.
= 6.28 Bags.

Therefore 6.28 bags of cement are required for 1 cubic meter M15 concrete.

We know that 1 bag of cement contains 50 kg.

So the cement quantity in kg = 50 × 6.28 = 314 kg.

Therefore 314 kg of cement requires for 1 cubic meter of M15 concrete.

Sand required for 1 cubic meter of M15 grade concrete

As we know for M15 concrete 1:2:4 ratio is used. Where 1 part is cement, 2 parts are sand, and 4 parts are Aggregate.

Sand part in the mix = 1/(sum of total proportion).
= 2/(1+2+4) = 2/7

To get the dry volume of concrete we have to multiply in volume by 1.54. Because the dry volume of concrete is always more than the wet volume of concrete.

Dry volume of concrete = Total volume × 1.54.
= 1m3 × 1.54 = 1.54m3.

The volume of sand = sand part in M10 grade concrete mix × 1.54m3.
= 2/7 × 1.54m3.
= 0.285 × 1.54m3 = 0.438m3.

Now before calculating sand quantity in 1 cubic meter of M15 grade concrete. we have to know the quantity of sand in 1 cubic meter.

Sand Quantity in 1 cubic meter = 1600 kg to 1800 kg.
We assume 1700 kg.

So, the quantity of sand = volume of sand in the mix × 1700 kg.
= 0.438 × 1700 = 744.6 = 745 kg.

Therefore 745 kg sand requires for 1 cubic meter M15 grade concrete.

Coarse/ Aggregate required for 1 cubic meter of M15 grade concrete

As we know for M15 concrete 1:2:4 ratio is used. Where 1 part is cement, 2 parts are sand, and 4 parts are Aggregate.

Aggregate part in the mix = 1/(sum of total proportion).
= 4/(1+2+4) = 4/7

To get the dry volume of concrete we have to multiply in volume by 1.54. Because the dry volume of concrete is always more than the wet volume of concrete.

Dry volume of concrete = wet volume of concrete × 1.54.
= 1m3 × 1.54 = 1.54m3.

The volume of aggregate = Aggregate part in M15 concrete mix × 1.54m3.
= 4/7 × 1.54m3.
= 0.571 × 1.54m3 = 0.879m3.

Now before calculating aggregate quantity in 1 cubic meter of M15 grade concrete. we have to know the quantity of aggregate in 1 cubic meter.

Aggregate Quantity in 1 cubic meter = 1500 kg to 1800 kg.
We assume 1600 kg.

So, the quantity of aggregate = volume of aggregate in the mix × 1700 kg.
= 0.879 × 1700 = 1494 kg.

Therefore 1406 kg Aggregate requires for 1 cubic meter M15 grade concrete.

Water required for 1 cubic meter M15 grade concrete

water required for M15 concrete is 35 to 60% of the cement quantity. It varies between 35 to 60% according to the moister conditions in sand and aggregate.

Required Cement quantity for 1 cubic meter M10 concrete = 314 kg.

Assume water quantity = 50% of cement Quantity.

required water quantity for 1m3 M15 concrete = 50/100 × 222
= .50 × 314
= 157 kg = 157 Liters.

Therefore 157 liters of water requires for 1 cubic meter M15 concrete.

You Should Also Read This:

Conclusion:

In this article, we have discussed how much Cement, Sand, and Aggregate required for M15 concrete. After calculating we get 314 kg of cement required for 1 cubic meter M15 concrete, 745 kg of sand required for 1 cubic meter of M15 concrete, 1494 kg of aggregate required for 1 cubic meter of M15 concrete, and 157 liters of water required for 1 cubic meter of M15 concrete.

How much cement is needed for M15 concrete?

314 kg or 692 pounds of cement is needed for 1 cubic meter of M15 grade concrete.

Required quantity of sand for M15 concrete.

745 kg or 1642 pounds of sand is needed for 1 cubic meter of M15 concrete.

Required quantity of aggregate for M15 concrete.

1494 kg or 3294 pounds aggregate is needed for 1 cubic meter of M15 concrete.